How to set up a double pulley system

Written by will charpentier
  • Share
  • Tweet
  • Share
  • Pin
  • Email
Introduction
  • Introduction

    How to set up a double pulley system

    Reeving blocks to set up a double pulley system requires a little thought. A double pulley system, also known as a "block and tackle," consists of the pulleys, or blocks, and the tackle, the ropes rived through the blocks. You must decide if you will use a double pulley system with one sheave--the roller in a pulley--in each block, which will give you a mechanical advantage of 3 to 1, or a double pulley system with two sheaves in each block, which will give you a mechanical advantage of 5 to 1.

    Rigging your own block and tackle takes some thought. (Illustrations by the Author)

  • 1 / 5

    Lay the blocks on the deck, 2 to 3 feet apart, with one block on its side and the other on its face. The hooks should point away from each other. The block lying on its side will be the upper block of the tackle; the bottom block will attach to the load.

  • 2 / 5

    Reeve the line from the left, through the sheave of the block lying on its side.

  • 3 / 5

    Reeve the rope through the sheave of the block lying on its face.

  • 4 / 5

    Bring the rope up to the becket of the block lying on its side and secure it to the becket with a becket bend or an eye splice.

  • 5 / 5

    Use the block that has the rope belayed to its becket as the uppermost block in your tackle to gain the best mechanical advantage.

  • 1 / 7

    Lay the blocks on the deck, 2 to 3 feet apart, with one block on its side and the other on its face. The hooks should point away from each other. The block lying on its side will be the upper block of the tackle; the bottom block will attach to the load.

  • 2 / 7

    Reeve the line from the left, through the sheave nearest the deck on the block lying on its side.

  • 3 / 7

    Reeve the rope through the one sheave of the block lying on its face.

  • 4 / 7

    Reeve the rope though the empty sheave of the block lying on its side.

  • 5 / 7

    Reeve the rope through the remaining sheave of the block lying on its face.

  • 6 / 7

    Pass the rope up to the becket of the block lying on its side and secure it to the becket with a becket bend or an eye splice.

  • 7 / 7

    Use the block that has the rope belayed to its becket as the uppermost block in your tackle to gain the best mechanical advantage.

  • Checklist

    Things you will need

    • 2 blocks, each either two-sheave or three-sheave
    • Line, natural or synthetic fibre
  • More information

    Tips and warnings

    Until rived through a block, it's called "line." After being rived through a block, it becomes part of "tackle" and is called rope.

    Always ensure that the line and blocks chosen have a sufficient safe working load for the task you are attempting.

Don't Miss

Filter:
  • All types
  • Articles
  • Slideshows
  • Videos
Sort:
  • Most relevant
  • Most popular
  • Most recent

No articles available

No slideshows available

No videos available

By using the eHow.co.uk site, you consent to the use of cookies. For more information, please see our Cookie policy.