How to change the order of a playlist's songs on myspace

Written by erika dean
  • Share
  • Tweet
  • Share
  • Pin
  • Email
How to change the order of a playlist's songs on myspace
(Digital Vision./Digital Vision/Getty Images)

One feature of MySpace accounts allows you to add songs to your profile. If you added songs to your MySpace playlist and want to change the order in which the songs are played, it takes very little time to do so. You only need to sign in to your MySpace account to get started.

Skill level:
Easy

Instructions

  1. 1

    Sign in to your MySpace account and hover over the "Profile" tab located in the navigation bar.

  2. 2

    Select "My Playlists" from the drop-down menu. A new page will open that has a list of your MySpace playlists.

  3. 3

    Look to the playlist that has the songs you want to change the order of and click "Edit."

  4. 4

    Click a song title you want to put in a different position on your playlist and drag the song to its new position. Continue dragging and dropping other songs titles until you are satisfied with the order of your playlist. The playlist will save automatically.

Tips and warnings

  • If you want to remove a song from your MySpace playlist, click "Edit" beside the playlist and then click the "X" beside the song while you delete.

Don't Miss

Resources

Filter:
  • All types
  • Articles
  • Slideshows
  • Videos
Sort:
  • Most relevant
  • Most popular
  • Most recent

No articles available

No slideshows available

No videos available

By using the eHow.co.uk site, you consent to the use of cookies. For more information, please see our Cookie policy.