How to Write a Project Scope for Construction Projects

Written by jennifer vanbaren
  • Share
  • Tweet
  • Share
  • Pin
  • Email
How to Write a Project Scope for Construction Projects
A project scope states all details of a construction project. (Jupiterimages/Brand X Pictures/Getty Images)

A project scope is a written statement that describes the work needed in a construction project. It is designed to inform the project team what needs to be completed. A project scope is created during the first step of planning a project and sets the tone for the remainder of the project planning. It is prepared by a general contractor and is given to companies bidding on the job.

Skill level:

Other People Are Reading


  1. 1

    Review the blueprints, drawings and specifications of the project. A project scope is created by someone knowledgeable in the construction field. The person creating it must completely understand how the project must be carried out. When the scope is written, the drawings and specifications are referred to frequently.

  2. 2

    Create a project charter. A charter is necessary for authorising the project, providing a high level overview of it and identifying the main stakeholders. The charter includes the names of the project owner and sponsors. It also identifies the project objectives and constraints. Throughout the life of the project, the charter is referred to often.

  3. 3

    Identify the purpose or reason of the project. This statement is often referred to as the project justification. This statement contains two or three sentences explaining the purpose and importance of the project, and is included in the project charter.

  4. 4

    List the project requirements. This next section of the project scope is designated for requirements, deliverables and non-goals. The requirements of the job are objectives expected to be met, including all significant milestones. Non-goals are items that do not fit into any specific category of objectives. The deliverables are included in this section and must be very specific. Deliverables are agreed upon materials, including training, required for the job.

  5. 5

    Determine cost estimates. The costs should be estimated as realistically as possible to keep the project moving along while staying on budget. Each specific aspect of the job should be calculated and listed individually.

  6. 6

    Obtain formal acceptance signatures. After the project scope is complete, it is customary to hold a meeting to obtain the appropriate signatures for acceptance of the project scope.

Don't Miss

  • All types
  • Articles
  • Slideshows
  • Videos
  • Most relevant
  • Most popular
  • Most recent

No articles available

No slideshows available

No videos available

By using the site, you consent to the use of cookies. For more information, please see our Cookie policy.