Footers and piers create the foundation that will support your mobile home once it is placed on a lot. Typically, the footers are made of concrete and the piers are breeze blocks that are stacked and fastened with mortar. The footers, which provide a solid base for the piers, are often preformed concrete that you simply set in place. The piers will be built to the height of the mobile home frame to provide support to the floors.

Skill level:
Easy

Other People Are Reading

Things you need

  • Preformed concrete footers
  • 8-inch by 8-inch by 16-inch breeze blocks
  • Level
  • Tape measure
  • Construction adhesive
  • Two-by-eight pressure-treated lumber

Show MoreHide

Instructions

  1. 1

    Place preformed concrete footers in the ground under where the steel support beams of the mobile home will land. Place footers no more than 10 feet apart. Perimeter footers need to be located no more than 2 feet from the exterior walls of the mobile home. Space footers less than 10 feet apart in areas that will bear heavy furniture, such as couches, beds and dining room tables.

  2. 2

    Build the piers out of breeze blocks to create a 16-inch square on top of the footers. Do not place the breeze blocks on the ground surrounding the footer as this defeats the purpose of using a footer to prevent weather shifting. Use mortar between all breeze blocks to provide additional support to the structure. Continue building the pier until it is at the height of the mobile home frame. As you build the breeze block piers, alternate the direction of the two blocks on each level of the pier.

  3. 3

    Use a level to make sure the pier will provide a flat surface for the mobile home to rest on. Measure all piers to make sure they are the same height. Make a note of any piers that will need to be capped with a thicker piece of lumber to make them level.

  4. 4

    Place two lengths of two-by-eight pressure-treated lumber side by side on top of the concrete piers to cap the footer-and-pier system. For additional support, apply construction adhesive to the top of the breeze blocks before laying the boards on top.

Tips and warnings

  • Follow state and local building codes when completing any construction project.
  • Consult a structural engineer if you are unsure where to place the footers and piers.

Don't Miss

Filter:
  • All types
  • Articles
  • Slideshows
  • Videos
Sort:
  • Most relevant
  • Most popular
  • Most recent

No articles available

No slideshows available

No videos available

By using the eHow.co.uk site, you consent to the use of cookies. For more information, please see our Cookie policy.